Saranap Village
Overview
PROJECT DESCRIPTION
The project applicant, Hall Equities Group (HEG), originally proposed the following:
- Redevelopment of a portion of Boulevard Way into a mixed-use village with residential uses and neighborhood-serving restaurants, services, and shops. This would be accomplished by replacing outdated buildings (majority constructed in the 1960s) with four buildings (designated Sites A, B, B1, and C) containing: 235 multi-family units - a mixture of for-sale and rental; up to approximately 30,000 square feet of street-level retail and restaurant uses; approximately 14,200 square feet of community-oriented fitness club; private amenities for use by the project's residents; and off-street structured parking. The buildings would vary in size and each would reflect a different architectural style. The largest building, located on Site A, would contain approximately 315,500 square feet, including its garage. Building heights would vary to accommodate topographic changes across the project site, with Site A ranging in height from approximately 68 to 80 feet, Site B ranging from approximately 65 to 78 feet, Site B1 ranging from approximately 46 to 56 feet, and Site C ranging from approximately 55 to 58 feet.
- Improvements to the Boulevard Way and Saranap Avenue rights-of-way including: reducing Boulevard Way from four lanes to two along the project frontage up to the intersection with Flora Avenue; and installing a roundabout, traffic circle, angled and parallel on-street parking, traffic calming elements, streetscape amenities, sidewalks, crosswalks, street lighting, landscaping, and utilities.
- A General Plan amendment to change the existing Multiple-Family, Medium Density (MM) and Commercial (CO) land use designations to a project-specific Mixed Use (MU) designation.
- A rezoning to change the existing General Commercial (C), Multiple-Family Residential (M-29), Planned Unit (P-1), Retail Business (R-B), and Neighborhood Business (N-B) zoning districts all to a project-specific Planned Unit (P-1) district.
MITIGATED PLAN ALTERNATIVE (MPA) PROJECT DESCRIPTION
Subsequent to the close of the 60-day review and comment period (September 19, 2014 through November 17, 2014) for the Draft Environmental Impact Report (DEIR) which analyzed the project as described above, the project applicant submitted a plan for a smaller project identified as the "Mitigated Plan Alternative" (MPA). This MPA was designed by the applicant to reduce impacts of the project by specifically implementing and achieving "Mitigation Measure AES-1: Reduce Height" of the DEIR. On July 24, 2015, the Department of Conservation and Development published a Notice of Preparation (NOP) indicating its intent to prepare a Recirculated Draft Environmental Impact Report (RDEIR) analyzing the MPA and addressing additional issues raised during the DEIR public comment period. The RDEIR was posted on May 5, 2016, with the 62-day public review period spanning through July 6, 2016. The smaller MPA project is described as follows:
- Redevelopment of a portion of Boulevard Way into a mixed-use village with residential uses and neighborhood-serving restaurants, services, and shops. Replacement of existing buildings with four buildings (designated Sites A, B, B1, and C) containing: 196 multi-family units (for-sale and rental); up to 22,260 square feet of retail and restaurant uses; private amenities for use by the project's residents; and off-street structured parking. The buildings would vary in size and each would reflect a different architectural style. The largest building located on Site-A would contain approximately 238,345 square feet, including its garage. Building heights would vary to accommodate topographic changes across the project site, with Site-A ranging in height from approximately 62 to 76 feet, Site-B ranging from approximately 55 to 71feet, Site-B1 ranging from approximately 47 to 57 feet, and Site-C ranging from approximately 52 to 60 feet.
- Improvements to the Boulevard Way and Saranap Avenue rights-of-way including: reducing Boulevard Way from four lanes to two along the project frontage up to the intersection with Flora Avenue; and installing a roundabout, median, angled and parallel on-street parking, traffic calming elements, streetscape amenities, sidewalks, crosswalks, street lighting, landscaping, and utilities.
- A rezoning to change the existing General Commercial (C), Multiple-Family Residential (M-29), Planned Unit (P-1), Retail Business (R-B), and Neighborhood Business (N-B) zoning districts all to a project-specific Planned Unit (P-1) district.
- A General Plan amendment to change the existing Multiple-Family, Medium Density (MM) and Commercial (CO) land use designations to a project-specific Mixed Use (MU) designation.
- A modification to the General Plan Roadway Network Map to change the roadway reclassification of Boulevard Way from "arterial" to "collector".
- A General Plan text amendment to modify the text of Implementation Measure 5-w of the Transportation and Circulation Element.
2017 REVISED SUBMITTAL
Following the close of the public comment period for the RDEIR in July 2016, County staff and representatives of HEG met to discuss the comments and feedback received. In response to ongoing concerns, HEG submitted a revised design further downsizing Site A. Depending on the vantage point from which it was viewed, Site A would range in height from approximately 29.5 feet to 67.3 feet. Relative to the MPA, total building area would decrease from approximately 238,345 square feet to approximately 205,170 square feet, including a reduction in retail/commercial square footage from 22,260 to 8,700. Unit count would increase slightly from 196 to 198. The Site B, B1, and C building designs remain unchanged from the MPA. The landscape/streetscape designs would remain unchanged from the MPA except where changes were necessary to accommodate the revised Site A building design. All other aspects of the project remain unchanged from the MPA.
PROJECT PLANS
Site A (PDF)
Sites B (PDF)
Site C (PDF)
Height Zone Map - Revised 2017 (PDF)
Building Height Exhibit - New 2017 (PDF)
PROJECT LOCATION
The project site is located in the unincorporated Saranap area of Contra Costa County between the cities of Walnut Creek and Lafayette, less than one quarter mile west of the Walnut Creek city limits and just south of State Highway 24. The project site consists of approximately 4.6 acres clustered around the intersection of Boulevard Way and Saranap Avenue, extending along the north and south sides of Boulevard Way and along the east side of Saranap Avenue. Properties comprising the project site are addressed as 1285, 1298, 1299, 1300, 1310, and 1326 Boulevard Way, and 1176 and 1180 Saranap Avenue.
Resources & Documents
June 28, 2017 County Planning Commission Staff Report (PDF)
Saranap Village Project Final EIR 2017 (PDF) **uploaded 6/16/17
Saranap Village Re-circulated DEIR May 2016 (PDF) **uploaded 6/16/17
Saranap Village Re-circulated DEIR - Appendices May 2016 (PDF) **uploaded 6/16/17
Notice of Preparation - July 24, 2015 - Recirculated Draft EIR (PDF)
- Draft Environmental Impact Report (DEIR) (PDF)
- DEIR Appendices A-F (Notice of Preparation, Air Quality Technical Reports, Special-status Species and Biology Technical Reports, Greenhouse Gas Technical Reports, Hydrology Technical Reports, Noise Technical Reports) (PDF)
- DEIR Appendix G (Transportation and Traffic Technical Reports) (PDF)
- Cultural Resources Reports (PDF)
- Geological Reports (PDF)
- Hazardous Materials Reports (PDF)
- Utilities Reports (PDF)
Notice of Preparation - March 19, 2014 (PDF)
EIR Project Archive Page
Draft EIR (DEIR) Reference Documents
These documents are referenced in the Draft EIR above and provided here in response to a Public Records Act request.
- ABAG-MTC, 2012a Plan Bay Area Jobs and Housing (PDF)
- ABAG-MTC, 2012b selected census data SF (PDF)
- AECOM, 2012 Sec 4.13 of 1500 N. California Blvd EIR (PDF)
- BAAQMD, 2009(a) Justification Report (PDF)
- BAAQMD, 2009(b) CEQA Air Quality Guidelines (PDF)
- BAAQMD, 2010 CAP (PDF)
- BAAQMD, 2010 Final Clean Air Plan Vol 1 (PDF)
- BAAQMD, 2010 Source Inventory of BA GHG (PDF)
- BAAQMD, 2011 CEQA AQ Guidelines (PDF)
- BAAQMD, 2012 CEQA AQ Guidelines (PDF)
- Busby, 2012 Perez letter (PDF)
- California Department of Conservation, 2014 County Conversion Tables (PDF)
- Caltrans, 1998 noise protocol (PDF)
- Caltrans, 2013 construction vibration (PDF)
- Caltrans,2002 TIS Guidelines (PDF)
- CAPCOA, 2008 CEQA and Climate Change (PDF)
- CAPCOA, 2010 GHG Quantification (PDF)
- CCCSD, 2010 Collection System Master Plan Update (PDF)
- CCTA, 2009 Bicycle and Pedestrian Plan (PDF)
- CCTA, 2011 Final 2011 CMP (PDF)
- CDFG, 2011 Special Animals List (PDF)
- CDFW, 2014 CNDDB Species List (PDF)
- CDMG, 1987 Aggregate Resource Areas Full (PDF)
- CDWR, 2004_Ygnacio Valley Bulletin 118 (PDF)
- CDWR, 2009 Model Water Efficient Landscape Ordinance (PDF)
- CGS, 1990 SP 104 Loma Prieta (PDF)
- CGS, 2002 California Geomorphic ProvincesNote 36 (PDF)
- CGS, 2002 Note 32 EQ Measure (PDF)
- City of Oakland, 2014 Bird Safety Measures (PDF)
- City of Walnut Creek, 2005 GP DEIR (PDF)
- City of Walnut Creek, 2006 GP Cht 3 (PDF)
- CNDDB, 2014 Walnut Creek Inventory (PDF)
- CNDDB, 2014 WalnutCreek+8 (PDF)
- CNPS, 2014 Species List (PDF)
- Collins, 2014 (PDF)
- Contra Costa County, 2004 Construction and Debris Recovery (PDF)
- Contra Costa County, 2009 Hazardous Materials Area Plan (PDF)
- Contra Costa County, 2009 WC sphere of influence (PDF)
- Contra Costa County, 2010 Historic Resources Inventory (PDF)
- Contra Costa County, 2012 Draft CAP (PDF)
- County Connection,2014_Bus Maps and Schedules (PDF)
- Darwin Meyers Associates, 2014 Geo Peer Review (PDF)
- DOF, 2013 (PDF)
- EBMUD, 2011_2010 Urban Water Management Plan (PDF)
- EBMUD, 2012 Water Supply Management Update (PDF)
- EDD, 2012e (PDF)
- EDD, 2014a (PDF)
- EDD, 2014b (PDF)
- EDD, 2014c (PDF)
- EDD, 2014d (PDF)
- Federal Transit Administration, 2006 Transit Noise and Vibration Impact Statement (PDF)
- Gauthreaux Besler, 2006 Effects of Artificial Night Lighting on Birds (PDF)
- Hagel, 2012 Records Search Saranap Village (PDF)
- Hart, 2007 SP 42 AP Zones (PDF)
- Helley and LaJoie,1979 Flatland Deposits of SF Bay Area Region (PDF)
- Holman and Associates Archaeological Consultants, 2008 Sanctuary for Sufism (PDF)
- ITE, 2012 Trip Generation Manual (PDF)
- King, 1978 (PDF)
- Learned, 2014 (PDF)
- Lochhead, 2008 Bird Species Plummet (PDF)
- Massey et. al., 2003 Primary Record Form P-07-002608 (PDF)
- Massey et. al., 2004_Cultural Resources Study (PDF)
- MBH et al, 2014 visual study (PDF)
- Meyer et. al., 2007 Geoarchaeological Overview of Bay Area Counties (PDF)
- Milliken et. al., 2009 Ethnohistory and Ethnogeography of the Coast Miwok and their Neighbors (PDF)
- Ninyo and Moore Phase I Environmental Site Assessment
- Omni Means, 2005 Traffic Study for Retail-Starbucks Development in City of Dublin (PDF)
- Peterson, 1996 Seismic Hazard Assessment (PDF)
- Porter, 1980 Archaeological Investigation of Parcel 184-150-002 (PDF)
- ScottandSpringer, 2003_CEQA and Fossil Preservation (PDF)
- Shuford Gardali, 2008 California Bird Species of Special Concern (PDF)
- SVP, 1995 StandardsAndGuidelines (PDF)
- TRB,2000 Highway Capacity Manual (PDF)
- US Census, 2014a (PDF)
- US Census, 2014b (PDF)
- USFWS, 2014 Federal Species List (PDF)
-
Sean Tully
Principal PlannerPhone: 925-655-2878
-
Current Planning
Physical Address
30 Muir Road
Martinez, CA 94553
Phone: 925-655-2705