Pacheco Boulevard Improvements - Blum Road to Morello Avenue

Project Information
Project Number: 0662-6R4113

Supervisory District: 5


 Project Location:
Along Pacheco Boulevard from Blum Road to Morello Avenue, within unincorporated Contra Costa County and the City of Martinez.

Project Description: Contra Costa County and the City of Martinez are conducting a joint study to evaluate alternatives to improve Pacheco Boulevard between Blum Road and Morello Avenue. The study is aimed at improving the roadway to meet future capacity needs, as well as, providing accommodations for all users. The project will consider widening of the roadway, intersection configuration, continuous sidewalks, the addition of bike lanes, and coordination with transit companies.

Pacheco_Blvd Map

Segment 1 – Blum Road to Arnold Drive
Segment 2 – Arnold Drive to Arthur Road, including realignment at the Burlington Northern Santa Fe Railroad tracks
Segment 3 – Arthur Road to Camino del Sol
Segment 4 – Camino del Sol to Morello Avenue

Purpose and Need: Pacheco Boulevard is a north-south arterial running parallel to the I-680 freeway from Concord Avenue/Chilpancingo Parkway to the south to Court Street and Marina Vista Avenue to the north. Widening of this segment of Pacheco Boulevard will improve the road capacity to serve local trips between downtown Martinez and the commercial areas along Contra Costa Boulevard. The existing roadway has limited segments of sidewalks and bike lanes. The project will look at "complete street" implementation by providing continuous sidewalks and bike lanes throughout the corridor.

Schedule: 
2014-2017 - Initial Study completed with the City of Martinez

2016-04-27 Community Meeting

Meeting Flyer (PDF)
Press Release (PDF)
Meeting Presentation (PDF)

2019 - Project in discussions with BNSF about railroad crossing

Project Funding:
Partial funding for the project is provided by Measure C/J transportation sales tax. Link to the Contra Costa Transportation Authority (CCTA) project website

Project Documents:
Project Fact Sheet (PDF)

Alignment Study and Alternatives Analysis (PDF)

Appendix A - Traffic Operations Analysis Report (PDF), Conceptual Layouts (PDF)

Appendix B - Survey Report (PDF)

Appendix C - Preliminary Right of Way Investigation

Attachment - Right of Way and Utility Exhibit (PDF)

Appendix D - Biological Resources Memorandum (PDF)

Appendix E - Floodplain, Hydrology & Hydraulics and Clean Water Memorandum (PDF)

Attachment B - FEMA FIRMette Panels (PDF) 
Attachment C - Risk Level Calculations (PDF)
Attachment D - Web Soil Survey (PDF)

Appendix F - Utilities Memorandum (PDF)

Appendix G - Initial Site Assessment

Appendix H - Preliminary Environmental Memorandum (PDF)

Appendix I - Preliminary Opinion of Probable Cost (PDF)

Appendix J - Outreach Memorandum

Attachment A - Project Fact Sheet (PDF)
Attachment B - Community Meeting Mailer (PDF)
Attachment C - Community Meeting Banners (PDF)
Attachment D - Comment Card (PDF)
Attachment E - Notice to Las Juntas Elementary School (PDF)
Attachment F - Community Meeting Presentation (PDF)