Bailey Road/State Route 4 Interchange Pedestrian & Bicycle Improvements


Project Information

Project Number: 0662-6R4121

Federal Number: ATPL-5928(136) 

Project Description: This Project will improve safety and circulation of pedestrians and bicyclists along Bailey Road through the State Route 4 (SR4) interchange. The project will remove the SR4 westbound loop off-ramp and pedestrian tunnel and install a 12-foot wide sidewalk and Class II bike lane. The westbound diagonal off-ramp will be widened and a new traffic signal will be installed at this intersection to improve circulation. The intersection of Bailey Road, the BART access road, and the SR4 eastbound loop off-ramp will be augmented by eliminating the free right turn lanes and modifying the traffic signal.

General Location: Bailey Road, Bay Point
Supervisory District: 5
Location: 38°01'10.0"N 121°56'30.8"W
Contract Cost (Est.): $3,304,000
Project Manager: Nelson Gonzales
Bid Due Date: Spring 2020
Working Days: 100
Construction Date: Summer 2020
Funding Source: Active Transportation Program Funds, Measure J Funds, Navy Mitigation Funds, Local Road Funds (SB1) sb1-logo-sm

DBE Program: This project is partially funded by federal funds from U.S. Department of Transportation. The prospective bidders are required to comply with 49 Code of Regulations (CFR) Part 26. The prospective bidders must meet the project-specific Underutilized Disadvantaged Business Enterprise (UDBE) goal or document the Good Faith Effort (GFE) process. It is important to note that to comply with the County DBE program's Good Faith Effort, the bidders must take certain actions a minimum of 15 days prior to bid opening.