Project No.: 0672-6U6202 Federal No.: ER 32L0(517)
Project Description: Work to be done includes replacing a damaged Corrugated Metal Pipe (CMP) with a Reinforced Concrete Pipe (RCP) and repairing the CMP using invert paving. The pipe invert will be filled with concrete reinforced baffles for fish passage. Work will also include temporary water diversion and de-watering, reconstructing of the roadway and roadside ditch, replacing roadway striping, and reconstructing and stabilizing the embankment using rock slope protection.
General Location: Pinehurst Road, 2.5 miles northwest of Canyon Road at the first hairpin, Orinda, CA Supervisory District: # 2 Location:Pinehurst Road, Orinda Contractor: W.R. Forde Associates, Inc. Project Engineer: Steve Patterson, Park Engineering, Inc. Construction Start Date (Est): August 23, 2021 Funding Source: Caltrans ER Funding, Local Funds Working Days: 30 Construction End Date: Fall 2021
DBE Program: This project is partially funded by federal funds from U.S. Department of Transportation. The prospective bidders are required to comply with 49 Code of Regulations (CFR) Part 26. The prospective bidders must meet the project-specific Disadvantaged Business Enterprise (DBE) goal or document the Good Faith Effort (GFE) process. It is important to note that to comply with the County DBE program’s Good Faith Effort, the bidders must take certain actions a minimum of 15 days prior to bid opening.