San Pablo Dam Road Traffic Safety Improvements

Project Information

             
Project No.:  0662-6R4151        
Federal No.:  HSIPL-5928(142)

Project Description:  Work to be done includes of installing a centerline rumble strip and channelizers between the city limits of the City of Richmond and the city limits of the City of Orinda, reconstructing median islands, replacing roadside signs to meet new retro-reflectivity standards, installation of speed feedback signs, partial slurry seal, removal and replacement of thermoplastic stripes and pavement markings, and restriping for a bike lane at two intersections of San Pablo Dam Road and Old San Pablo Dam Road.
                       
General Location: San Pablo Dam Road between El Sobrante and Orinda    
Supervisory District: # 1        
Location:  San Pablo Dam Road   
Contract Cost (Est.): Base BId:  $628,000, Additive Bid: $243,000
Project Manager: Pete Warden      
Bid Due Date: February 18, 2020
Funding Source: HSIP Funding, Local Road Funds    
Working Days: 30
Construction Date: Spring/Summer 2020

SB1 Logo


DBE Program: This project is partially funded by federal funds from U.S. Department of Transportation.  The prospective bidders are required to comply with 49 Code of Regulations (CFR) Part 26.  The prospective bidders must meet the project-specific Underutilized Disadvantaged Business Enterprise (UDBE) goal or document the Good Faith Effort (GFE) process.  It is important to note that to comply with the County DBE program’s Good Faith Effort, the bidders must take certain actions a minimum of 15 days prior to bid opening.

Project Links