DA 29G Storm Drain Line A Replacement

Project Information

  • Project No.:  0330-6W9C14          

Project Description:  The work to be done generally consists of replacing a 48” culvert at two sites. Work includes removing trench plates, dewatering, trench shoring, placing 48” HDPE pipe, concrete slurry backfill and hot mix asphalt.

  • General Location: Antioch
  • Supervisory District:  5  
  • Location: Maritime Way, Antioch
  • Contract Cost (Est.): $230,000    
  • Project Manager: Kenny Nguyen            
  • Bid Due Date: April 21, 2020
  • Working Days: 20
  • Construction Date: Summer 2020
  • Funding Source: Flood Control Funds

Outreach Program: The bidder shall make a “Good Faith Effort”, and document this effort, to obtain sub-bid participation by MBE’s, WBE’s, OBE’s, SBE’s and LBE’s in accordance with the project special provisions to be eligible for award.  Bidders that have not attended a pre-bid meeting in the last 12 months should attend the County pre-bid meeting noted in the Notice to Contractors.  The pre-bid meeting will include an overview of the Outreach Program requirements and staff will be available to answer your questions.