San Pablo Dam Road and Bailey Road Signal Hardware Upgrades
Project Information
Project No.: 0662-6R4139 State Project No.: HSIPSL-5928(162)
Project Description: Work generally consists of updating signal hardware including installing Advanced Dilemma Detection Zone systems, improve pedestrian crossing signal hardware, installing LED signal lights, and retroreflective backplates at 9 intersections on San Pablo Dam Road between El Portal Drive and Castro Ranch Road and 2 intersections on Bailey Road from Willow Pass to Canal Road.
General Location: El Sobrante, Bay Point Supervisory District: 1 & 5 Location:San Pablo Dam Road Site Map (PDF) and Bailey Road Site Map (PDF) Contract Cost (Est.): $822,000 Project Manager: Henry Hussey Bid Due Date: Spring 2023 Funding Source: HSIPSL (State), Local Road Funds Working Days: 40 working days Est. Construction Date: Summer 2023
Outreach Program: The bidder shall make a “Good Faith Effort”, and document this effort, to obtain sub-bid participation by MBE’s, WBE’s, OBE’s, SBE’s and LBE’s in accordance with the project special provisions to be eligible for award. Bidders that have not attended a pre bid meeting in the last 12 months should attend the County pre bid meeting noted in the Notice to Contractors. The pre bid meeting will include an overview of the Outreach Program requirements and staff will be available to answer your questions.