San Pablo Dam Road Storm Drain and Erosion Repair (200ft SE of La Honda Road)

Project No.: 0672-6U6272
Federal No.: TBD

Project Overview

The proposed work consists of repairing the roadway and road embankment along the far right lane of San Pablo Dam Road Road, approximately 200 feet southeast of the intersection with La Honda Road.  Repair work will include construction of a soldier pile retaining wall to restore and stabilize the roadway embankment.  The project will also include replacing an 18 foot damaged drainage culvert, installing a guardrail along the retaining wall and back-filling and reconstructing the damaged roadway and shoulder.

Project Location

Location: San Pablo Dam Road, El Sobrante
Supervisor District:  I

San Pablo Dam Road east of La Honda Road Photo 3

Project Updates

  • July 2023 - Subsurface Geotechnical investigation and topographical survey underway.
  • August 2023 - Preliminary design underway.
  • September 2023 - Request for Federal Funding through the Emergency Relief Program under review

Contact Information

Project Manager: Bradley Olazo
Email: [email protected]