Project will repair the roadway and road embankment along the westbound lane of Wildcat Canyon Road, approximately 500 feet west of the intersection with San Pablo Dam Road. Repair work will include construction of a soldier pile retaining wall to restore and stabilize the roadway embankment. The project will also include replacing approximately 300-feet of a damaged 24” drainage culvert, installing guardrail along the retaining wall and back-filling and reconstructing the damaged roadway and shoulder.
Project Location
Project location: Wildcat Canyon Road, approximately 500-feet west of the intersection with San Pablo Dam Road, Orinda Supervisory District: I, II
Project Funding
Funding Source: FHWA Emergency Relief Program, SB1 Local Gas Tax Estimated Cost of Construction: TBD
Project Updates
July 2023 - Subsurface Geotechnical investigation and topographical survey underway
August 2023 - Geotechnical investigations and topographical surveys complete. Preliminary Design underway
September 2023 - 35% Plans completed and under review